Difference between revisions of "Telescope"
From Cantr II Wiki
(→Days of work) |
m (→Resources) |
||
Line 57: | Line 57: | ||
For the mirrors: | For the mirrors: | ||
* 150 grams of [[window glass]] | * 150 grams of [[window glass]] | ||
− | * 100 grams of [[silver]](7 DOW) | + | * 100 grams of [[silver]] (7.14 DOW manual or 3.57 with pickaxe) |
DOW = Days of Work | DOW = Days of Work |
Revision as of 20:39, 12 February 2010
| ||||||||||||||||||||
| ||||||||||||||||||||
|
Map graphic holding a telescope (light green) vs normal view (dark green). You see 2 times further.
If you're going to make all the components at once and want to spare yourself the trouble of visiting several pages, in total you're going to need:
Resources
For the lenses:
- 180 grams of diamonds (12 or 6 DOW) or
The first value in parenthesis is manual gathering, the second one using a pickaxe or bronze pickaxe.
For the case:
- 100 grams of aluminum
- 200 grams of copper
- 50 grams of zinc (0.42 DOW manual or 0.21 DOW with a pickaxe)
For the eyepiece:
- 50 grams of steel
- 25 grams of rubber (0.5 DOW manual or 0.25 DOW with a rubber tapping knife)
For the mirrors:
- 150 grams of window glass
- 100 grams of silver (7.14 DOW manual or 3.57 with pickaxe)
DOW = Days of Work
Days of work
Days of work needed to produce the components, divided by skills used. This does not take into account the production or gathering of resources, as they can be acquired in several ways.
- 8 days of work in Manufacturing (3 DOW for lenses, 1 DOW for the eyepiece, 4 DOW for mirrors)
- 2 days of work in Smelting (for the case)
- 4 days of work in Manufacturing tools (for combining the components)
Tools
- a screwdriver
- a grinder
- a bronze or steel peen hammer
- a pair of pliers
- a soldering iron
- pincers
- a file