Smelting furnace

From Cantr II Wiki
Revision as of 16:29, 25 September 2005 by Sarah (talk | contribs)

Jump to: navigation, search
Tools.pngThis article contains errors or does not match the overall style of the Cantr Wiki and needs to be rewritten.

A smelting furnace, sometimes referred to as a smelter, is a machine used for creating metals from their ores. A primitive smelting furnace can also be used to create iron and bronze, but a smelting furnace is required in order to create aluminium or steel. While smelting furnace takes more resources and time to build than it's primative counterpart, and cannot be built outside, it processes the resources more efficiently; you need less ingredients to create any amount of a metal using it.

Requirements

Resources Required

Labour Required

  • 5 days

Tools Required

A smelting furnace can only be built inside a building.

Projects

Manufacturing steel (coal)

Output per day of labour

Maximum output

  • 56000 grams

Required resources

Required tools

Maximum workers

  • 5

Manufacturing aluminum (coal)

Output per day of labour

Maximum output

  • 8000 grams

Required resources

Required tools

  • none

Maximum workers

  • 5

Manufacturing aluminium (charcoal)

Output per day of labour

Maximum output

  • 8000 grams

Required resources

Required tools

  • none

Maximum workers

  • 5

Refining iron ore (coal)

Output per day of labour

Maximum output

  • 28000 grams

Required resources

Required tools

  • none

Maximum workers

  • 5

Refining iron ore (charcoal)

Output per day of labour

Maximum output

  • 28000 grams

Required resources

Required tools

  • none

Maximum workers

  • 5

Manufacturing aluminum (gas)

Output per day of labour

Maximum output

  • 10000 grams

Required resources

Required tools

  • none

Maximum workers

  • 5

Refining iron ore (gas)

Output per day of labour

Maximum output

  • 42000 grams

Required resources

Required tools

  • none

Maximum workers

  • 5

Manufacturing steel (gas)

Output per day of labour

Maximum output

  • 61600 grams

Required resources

Required tools

  • none

Maximum workers

  • 5

Smelting bronze (wood)

Output per day of labour

Maximum output

  • 40000 grams

Required resources

Required tools

  • none

Maximum workers

  • 5