Nickel drill

From Cantr II Wiki
Revision as of 05:05, 29 April 2007 by Ceselb (talk | contribs)

Jump to: navigation, search
Nickel drill
Manufacturing
Object typeMachinery
Skill usedManufacturing Machines
Time14 day(s)
Materials2000 grams of steel
200 grams of rubber
30 grams of diamonds
Toolsregular or bronze screwdriver
Locationhas nickel


A nickel drill produces nickel at four and a half times the speed of an unequipped person and over two times the speed of a pickaxe user.

Projects

Maximum workers: 2


Drilling for nickel

Output per day of labour

Required resources

  • none

Required tools

  • none

Skill used

Drilling for nickel (petrol)

Output per day of labour

Required resources

  • none

Required tools

Skill used