Coal drill
From Cantr II Wiki
Revision as of 05:27, 15 February 2006 by Joshuamonkey (talk | contribs)
A coal drill is used to gather coal more efficiently.
Requirements
Resources required
Labour required
- 10 days
Tools required
A coal drill can only be built on a location with coal.
Projects
Maximum workers: Unknown (hard)
===Unknown (medium)===
Output per day of labour
- 1000 grams of coal
Maximum output
- 80000 grams
Required resources
- none
Required tools
- none