Taconite drill

From Cantr II Wiki
Revision as of 04:29, 29 April 2007 by Ceselb (talk | contribs)

Jump to: navigation, search
Taconite drill
Manufacturing
Object typeMachinery
Skill usedManufacturing Machines
Time14 day(s)
Materials2000 grams of steel
200 grams of rubber
10 grams of diamonds
Toolsregular or bronze screwdriver
Locationhas taconite

Produces taconite at five times the speed of an unequipped person and two and a half times the speed of a pickaxe user.

Projects

Maximum workers: 2


Drilling for taconite

Output per day of labour

Maximum output

  • 600000

Required resources

  • none

Required tools

  • none

Skill used

Drilling for taconite (petrol)

Output per day of labour

Maximum output

  • 800000

Required resources

Required tools

  • none

Skill used