Limestone quarry

From Cantr II Wiki
Revision as of 18:30, 16 February 2007 by Ceselb (talk | contribs)

Jump to: navigation, search
Limestone quarry
Manufacturing
Object typeMachinery
Skill usedBuilding
Time20 day(s)
Materials1000 grams of medium rope
100 grams of iron
Objects4 large logs
2 medium logs
Toolsshovel or bronze shovel
pickaxe or bronze pickaxe
stone, bronze or regular hammer
regular or bronze screwdriver
Locationhas limestone

A limestone quarry produces limestone at four times the speed of an unequipped person and two times the speed of a shovel user.

Projects

Maximum number of workers: 2


Mining for limestone

Output per day of labour

Maximum output

  • 352000 grams

Required resources

  • none

Required tools

  • none

Skill used