Cam

From Cantr II Wiki
Revision as of 22:21, 25 December 2005 by Sho (talk | contribs)

Jump to: navigation, search

Uses

This semi-finished product is used in the following projects:

Construction

Days needed: 1.5

Raw materials needed:
20 grams of steel

Tools needed: bronze or steel peen hammer, bronze chisel or iron chisel, flatter, bronze set hammer or steel set hammer, sledgehammer

Machines required at location: bronze anvil or iron anvil

Misc