Nickel drill

From Cantr II Wiki
Revision as of 00:41, 31 January 2007 by Ceselb (talk | contribs)

Jump to: navigation, search

A nickel drill is used to increase the collection rate of nickel.

Requirements

Resources Required

Labour Required

  • 14 days

Tools Required

Build/Repair Skill: Manufacturing Machines

A nickel drill can only be built in a location with nickel.

Projects

Maximum workers: 2


Drilling for nickel

Output per day of labour

Required resources

  • none

Required tools

  • none

Skill used