Difference between revisions of "Coal drill"

From Cantr II Wiki
Jump to: navigation, search
Line 17: Line 17:
 
|}
 
|}
  
A '''coal drill''' produces [[coal]] at over five times the speed of an unequipped person and over two and a half times the speed of a [[pickaxe]] user.
+
Produces [[coal]] at over five times the speed of an unequipped person and over two and a half times the speed of a [[pickaxe]] user.
  
 
==Projects==
 
==Projects==
Line 24: Line 24:
  
 
----
 
----
 
+
===Drilling for coal===
  
 
'''Output per day of labour'''
 
'''Output per day of labour'''
Line 34: Line 34:
 
'''Required resources'''
 
'''Required resources'''
 
* none
 
* none
 +
 +
'''Required tools'''
 +
* none
 +
 +
===Drilling for coal (petrol)===
 +
 +
'''Output per day of labour'''
 +
* 1300 grams of [[coal]]
 +
 +
'''Maximum output'''
 +
* 104000 grams
 +
 +
'''Required resources'''
 +
* 50 grams of [[petrol]]
  
 
'''Required tools'''
 
'''Required tools'''
 
* none
 
* none

Revision as of 04:35, 29 April 2007

Coal drill
Manufacturing
Object typeMachinery
Skill usedManufacturing Machines
Time10 day(s)
Materials2000 grams of steel
200 grams of rubber
10 grams of diamonds
Toolsregular or bronze screwdriver
Locationhas coal

Produces coal at over five times the speed of an unequipped person and over two and a half times the speed of a pickaxe user.

Projects

Maximum workers: 2


Drilling for coal

Output per day of labour

Maximum output

  • 80000 grams

Required resources

  • none

Required tools

  • none

Drilling for coal (petrol)

Output per day of labour

Maximum output

  • 104000 grams

Required resources

Required tools

  • none